Stalagmite®
Pouring Standard Impressions
(using the Pouring Jig)

Check
relationship of RTP_Base to impression:

Rotate the Swing-Arm and RTP_Base 180 degrees from its full open position so RTP_Base pins are pointing down.
Be
careful when getting close to the impression because the impression may need additional trimming.
The yellow "stops" on the
yellow Swing-Arm should
rest on the green Swing-Arm
Stand without
any interference from the
impression.

The Swivel Table should not be moved or lowered if there
is contact with the impression. Rather, the impression should be trimmed because you will want to maintain the same relative relationship
with the RTP_Base that you had with the Pin-Locator. Lower the entire
Swivel Table if you must,
but remember that your stone die will end up longer.
Home Page >
1 2
3 4
5 6
7 8
9 10
11 12
13 14
15 16
17 18
19 20
21 22
23 24
25 26 |