Stalagmite®
Pouring Standard Impressions
(using the Pouring Jig) Check relationship of RTP_Base to impression:
Rotate the Swing-Arm and RTP_Base 180 degrees from its full open position so RTP_Base pins are pointing down. Be careful when getting close to the impression because the impression may need additional trimming. The yellow "stops" on the yellow Swing-Arm should rest on the green Swing-Arm Stand without any interference from the impression.
|